Grille Light Installation Specifications
Equipment
tools and materials
Equipment:
Welding machine, gun welding machine, electric drill tool, handle wire, welding
tongs, welding cap, gloves, flat spade steel tape measure spirit level movable
handle brush
Material:
processing and forming material: forming steel grid plate (in accordance with
design requirements) Form: load flat steel 40mm×5mm, load flat steel center
spacing 40mm, cross bar center spacing 100mm (planar and toothed) galvanized
mounting clips: Galvanized self-tapping screws: zinc-rich paint bits for
consumable materials, welding rod screws
Program
introduction
Numbering
and marking according to layout design drawings; installation guidance
according to layout design drawings; load flat steel according to the design
meets the material requirements of Q235-A; load test report of steel grid
plate; galvanized layer meets specification requirements; flatness of steel
grid plate The degree should meet the requirements. Operation sequence
Preparation →
Check before installation → The
steel grid plate is in place in different areas → Temporary fixation → Deviation measurement → Deviation
correction →
Final fixation
Method
of operation
Accurately
position and pay off according to the requirements of layout design drawings;
place the steel grid plate according to the layout design number into regions
and install in regions at the same time. After completing one region, install
the next region, each region should be from the middle to both sides Carry out;
strictly control the spacing between the steel grid plate and the steel grid
plate and other structures according to the specifications during installation;
after the steel grid plate is in place, first use the installation clip to
temporarily fix it, after the deviation measurement and correction Finally, fix
it; the steel grid plate is arranged according to the direction shown in the
figure. When it meets the H-shaped steel column, the steel grid plate is
opened, and the opening is made of steel plate as 100mm (height)×6mm skirting
board. If there is no need to move the steel grid plate after installation, it
can be welded to the bracket or steel beam. After welding, the welding slag and
flying splash are removed, and two zinc-rich paints are applied manually.
Precautions
for grille light installation
1.
In order to ensure the safe installation, maintenance and inspection of lights,
please entrust electrical professionals to take charge. Non-professional
construction is prone to danger.
2.
Do not install the light in the place shown. This luminaire is dedicated to
ceiling installation.
3.
Do not use it in parallel with the dimmer, and do not use it with the dimmer or
sensor to avoid malfunctions. Do not install above hot objects or in damp
places.
4.
Light sources larger than a specific maximum power cannot be used (please refer
to the power sticker on the product). In any case, the light should not be
covered by heat insulation pads or similar materials.
5.
Make sure there is a 75mm ventilation hole around the product. The use of this light
must not violate any fire prevention regulations. Before maintenance,
installation and replacement of the light source, please turn off the power and
confirm the correct installation of the light source.